Showing posts with label PUC. Show all posts
Showing posts with label PUC. Show all posts

Wednesday, March 30, 2011

Bicyclists Beware: Hazards During Construction on Baker and Grove in NOPA


Baker bike lane southbound: curb to curb to be paved in weeks ahead

Grove bike route pavement construction hazards, between Baker and Lyon

Two to three inch trench after initial PUC work on Grove

Defined edges like this should have asphalt shoved up to them for safety

UPDATE, Wednesday, March 30, 5pm
This afternoon Ms. Dadisi Najib, DPW Public Information Officer, reviewed the street conditions and hazards for bicyclists on Grove and Baker. She followed up within hours of being alerted to the problem. She confirmed that curb-to-curb repaving is planned for Grove between Baker and Lyon and for the blocks of Baker recently worked on. She also said she would find out about DPW's or the construction firm's interim plans for reducing risks for bicyclists by shoving asphalt along the edges ("cutback") of the construction lip.
__________________________________________________________________

The Public Utilities Commission is replacing sewer lines under North Panhandle streets, and that's a good thing. The city's aging infrastructure -- above and below ground -- needs all the attention it can get. But the construction itself is creating problems with a lack of attention to safety precautions and warnings to bicyclists.

Grove street between Baker and Lyon has been plagued with the tell-tale signs of sewer problems -- large sinkholes and many fill-ins -- for years. Now the sewer lines have been replaced but the temporary surface has been left two to three inches below grade with hard-edged trenches. Baker between McAllister and Fell has similar trenches. None of the drop-offs have asphalt shoved against them to smooth travel along the block, and, in a few areas, the trenches cut directly across the Baker bike lane and Grove bikeway.

Once all the sewer work is completed, the city will repave the blocks curb-to-curb. Although it's more economical to resurface the blocks at the same time, it's unnecessarily hazardous to leave the trenches as they are and not post warning signs. The city will likely address the risks, but, in the meantime, bikers beware, especially at night if you're unfamiliar with the street conditions.

Thursday, February 25, 2010

Steiner Street on the Wiggle NOW Safer


Seth Fischer is all for a smoother, safer Steiner Street on his commute

Surprise for cyclists turning northbound on Steiner from Duboce

One smooth 1/2 block; the southbound lane still needs work

This is why SFBC Good Roads Campaign blew the whistle on unsafe surface

Seth Fischer knows a smooth surface and that's what he got Thursday morning for his regular Wiggle spin from Duboce and northbound on Steiner. This stretch between Duboce and Herman has been one eyesore and hazard for some time. The Department of Public Works (DPW) has filled hole upon hole here in the past, but after the rains and especially the SFPUC/Water Department's construction on the south side of the street, only one option remained. Grind it out and add new smooth asphalt.

Neal Patel, Community Planner for the SF Bicycle Coalition, might have been the first to fully appreciate the change in the surface. Last night his ride on Steiner brought one huge smile from the just-completed paving. Just last week he was on the block with DPW reps urging quick action for the street defects. "As soon as the rain stopped enough for them to get out there, work crews took care of the problem," Patel said, "and they did a great job."

So, cyclists, enjoy the northbound lane, and here's the story on the bumpy utility trench work on Steiner southbound from Waller to Duboce. SFBC is also pushing for this work to be either re-applied or smoothed out by some other means as soon as possible. DPW managers are working with SFPUC to address the problem. Normally if utility work involves a cut that is 25% or longer of the given block, the full length of the block from curb to mid-point needs to be repaved. In this case, the city allowed a waiver since these blocks are due to be re-paved curb-to-curb after August 1st of this year. Budgets are tight, and SFBC volunteers* report just the real hazards to the city, not the regular inconveniences of the road. Given the huge amount of bicycle traffic that the Wiggle gets everyday, a wait of seven months or more seemed unwise for either the cyclists or the city's liability status.

This morning I also walked the block of Sanchez south of Duboce. Cyclists know how bad this block has been as well. A neighbor and homeowner from that block stopped by to chat -- and complain about the terrible street surface SFPUC left in its wake once they believed construction was done. After he heard about SFBC's efforts to get these streets smoothed, he smiled and said, "It's great to work on these problems as a community together; I really appreciate that the bike coalition is working on this." He also said he was going to get his neighbors to call 311 requesting a better pavement job.

*Full disclosure: Along with several other volunteers, I am a member of the SFBC Good Roads Crew.